Coverart for item
The Resource CMMI assessments : motivating positive change, Marilyn Bush, Donna Dunaway

CMMI assessments : motivating positive change, Marilyn Bush, Donna Dunaway

Label
CMMI assessments : motivating positive change
Title
CMMI assessments
Title remainder
motivating positive change
Statement of responsibility
Marilyn Bush, Donna Dunaway
Creator
Contributor
Subject
Language
eng
Member of
Cataloging source
UAB
http://library.link/vocab/creatorName
Bush, Marilyn
Dewey number
005.1/068/5
Illustrations
illustrations
Index
index present
LC call number
QA76.758
LC item number
.B867 2005
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://library.link/vocab/relatedWorkOrContributorName
Dunaway, Donna K.
Series statement
SEI series in software engineering
http://library.link/vocab/subjectName
  • Capability maturity model (Computer software)
  • Capability maturity model (Computer software)
Label
CMMI assessments : motivating positive change, Marilyn Bush, Donna Dunaway
Instantiates
Publication
Bibliography note
Includes bibliographical references (pages 375-380) and index
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
  • Ch. 5.
  • Planning and preparing for an assessment, part 2 : choosing a time : formulating an assessment plan : appointing an organization site coordinator and organizing logistics
  • Ch. 6.
  • Planning and preparing for an assessment, part 3 : creating an assessment team : selecting projects to be assessed : selecting people to be interviewed : defining the final assessment products : distributing questionnaires
  • Ch. 7.
  • Planning and preparing for an assessment, part 4 : assessment team training and post-training activities
  • Ch. 8.
  • Onsite activities, part 1 : the kick-off meeting and other presentations : collecting and managing documents throughout the assessment : problems associated with immature organizations
  • Ch. 9.
  • Onsite activities, part 2 : interviewing
  • Ch. 1.
  • Ch. 10.
  • Onsite activities, part 3 : the day-to-day consolidation of data
  • Ch. 11.
  • final stages of an onsite assessment : summing up and presenting results
  • Ch. 12.
  • How to use the results of an assessment productively
  • Why do assessments?
  • Ch. 2.
  • brief history of process improvement methodologies and assessment methods
  • Ch. 3.
  • Assessments : an executive overview
  • Ch. 4.
  • Planning and preparing for an assessment, part 1 : senior management responsibilities
Control code
79872369
Dimensions
unknown
Extent
1 online resource (xxix, 397 pages)
Form of item
online
Isbn
9780321179357
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
illustrations.
Specific material designation
remote
System control number
(OCoLC)79872369
Label
CMMI assessments : motivating positive change, Marilyn Bush, Donna Dunaway
Publication
Bibliography note
Includes bibliographical references (pages 375-380) and index
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
  • Ch. 5.
  • Planning and preparing for an assessment, part 2 : choosing a time : formulating an assessment plan : appointing an organization site coordinator and organizing logistics
  • Ch. 6.
  • Planning and preparing for an assessment, part 3 : creating an assessment team : selecting projects to be assessed : selecting people to be interviewed : defining the final assessment products : distributing questionnaires
  • Ch. 7.
  • Planning and preparing for an assessment, part 4 : assessment team training and post-training activities
  • Ch. 8.
  • Onsite activities, part 1 : the kick-off meeting and other presentations : collecting and managing documents throughout the assessment : problems associated with immature organizations
  • Ch. 9.
  • Onsite activities, part 2 : interviewing
  • Ch. 1.
  • Ch. 10.
  • Onsite activities, part 3 : the day-to-day consolidation of data
  • Ch. 11.
  • final stages of an onsite assessment : summing up and presenting results
  • Ch. 12.
  • How to use the results of an assessment productively
  • Why do assessments?
  • Ch. 2.
  • brief history of process improvement methodologies and assessment methods
  • Ch. 3.
  • Assessments : an executive overview
  • Ch. 4.
  • Planning and preparing for an assessment, part 1 : senior management responsibilities
Control code
79872369
Dimensions
unknown
Extent
1 online resource (xxix, 397 pages)
Form of item
online
Isbn
9780321179357
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
illustrations.
Specific material designation
remote
System control number
(OCoLC)79872369

Library Locations

    • Ellis LibraryBorrow it
      1020 Lowry Street, Columbia, MO, 65201, US
      38.944491 -92.326012
    • Engineering Library & Technology CommonsBorrow it
      W2001 Lafferre Hall, Columbia, MO, 65211, US
      38.946102 -92.330125
Processing Feedback ...