Coverart for item
The Resource Pipelines 2012 : innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida, sponsored by the Pipeline Division of the American Society of Civil Engineers ; edited by Robert J. Card, P.E., Michael K. Kenny, P.E

Pipelines 2012 : innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida, sponsored by the Pipeline Division of the American Society of Civil Engineers ; edited by Robert J. Card, P.E., Michael K. Kenny, P.E

Label
Pipelines 2012 : innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida
Title
Pipelines 2012
Title remainder
innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida
Statement of responsibility
sponsored by the Pipeline Division of the American Society of Civil Engineers ; edited by Robert J. Card, P.E., Michael K. Kenny, P.E
Contributor
Editor
Sponsor
Subject
Genre
Language
eng
Member of
Cataloging source
E7B
Dewey number
621.8672
Illustrations
  • illustrations
  • charts
Index
no index present
LC call number
TA660.P55
LC item number
P57 2012eb
Literary form
non fiction
Nature of contents
  • dictionaries
  • bibliography
http://library.link/vocab/relatedWorkOrContributorName
  • Card, Robert J.
  • Kenny, Michael K.
  • Pipeline Division of the American Society of Civil Engineers
http://library.link/vocab/subjectName
  • Pipelines
  • Pipelines
  • Pipelines
  • Pipelines
  • Pipelines
  • Pipelines
Label
Pipelines 2012 : innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida, sponsored by the Pipeline Division of the American Society of Civil Engineers ; edited by Robert J. Card, P.E., Michael K. Kenny, P.E
Instantiates
Publication
Copyright
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
  • Performance Testing of Underground Storage Tank against Buckling -- Organizing and Managing the Implementation of Large Diameter Tapping and Plugging Technology for a Major Sanitary Improvement Project in Ho Chi Minh City, Vietnam -- Ductile Iron Corrosion Theories and Science -- Design and Development of a Web-Based National Database for Water and Wastewater Pipeline Infrastructure Systems -- Fatigue of Plastic Water Pipe : A Technical Review with Recommendations for PE4710 Pipe Design Fatigue -- Novel Resilience Assessment Methodology for Water Distribution Systems -- Contingency and Emergency : Prior Planning, "Real Live" Execution, and Post Mortem of the Results -- Water Transmission Main Condition Assessment in the Last Frontier : A Magnanimous Endeavor for the Anchorage Water and Wastewater Utility -- Protection of Petroleum and Natural Gas Pipelines Crossing Debris Flow Watersheds A Case Study in the Qinling Mountains, Western China -- Meeting the Challenge of Pipeline Emergency Repair -- PressureCast Steel Pipe Combined Load Test Set-Up and Execution -- Unidirectional Flushing (UDF) : It's Not Just about Cleaning the System Anymore Benefits and Advantages that West Springfield, Massachusetts Achieved with Their Program -- Transmission Main and Plastic Pipe Leak Detection Using Advanced Correlation Technology : Case Studies -- Installation of a 42 Inch HDPE Pipeline at Seminole County's Regional Water Treatment Facility at Yankee Lake -- Risk Management in Real Time Transient Control Testing on a Large Conveyance System -- Integration of HDPE 4710 Materials for Potable Water Distribution Systems -- Five Years and Counting : The Evolution of WSSC's PCCP Management Program -- City of Westminster's Sewer Collection System Assessment Program : A Case Study -- GIS : A Decision Making Tool for Pipeline Asset Management in Atlanta -- Intake Screen Alternatives for the IPL Project Planning for Mussels and Variable Intake Depths -- Variability of Pipe Coating Pull-Off Adhesion Measurements on Cylindrical Steel Pipelines -- Evaluation of Statically-Loaded Large Diameter Steel Pipe Embedded with Lime Stabilized Native Clay Soils -- Seismic Fragility Evaluation of Water Pipelines : Part 1 Current Practice -- Galveston's Life Line Considerations When Designing an Aerial Crossing -- Who Says You Need Multiple Wire Breaks for a PCCP Pipe to Fail? -- Condition Evaluation of Asbestos Cement Water Mains -- Numbers Don't Lie : PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data -- From Pilot to Permanent : Evolution of LWC's PCCP Condition Assessment Program -- A Methodology for Condition Assessment of Pressure Water Mains -- Implementation of Sustainability Initiatives and the Envision Rating System on the Omaha CSO Program -- PCCP Condition Assessment Methodology : What Is Right for You? -- Enhancing Asset Management Priority Ranking A Case Study -- Condition Assessment of 23 Lift Stations -- Integrated Monitoring Strategy for Large Diameter Pre-Stressed Concrete Pipelines A Case Study at Waternet, the Netherlands -- Protecting the Magic City -- Pilot Large Diameter Pipeline Seismic Fragility Assessment -- Restoring Water Network Reliability and Control in the City of Baltimore -- New Approaches to Inspect Water Pipelines Running under Rivers, Lakes, Levies, and Critical Transport Infrastructure -- Reducing the Cost of Failure : Time is the Unforgiving Enemy during Pipeline Ruptures -- The Problem of Leakage Detection on Large Diameter Mains -- Condition Assessment of a Ductile Iron Force Main Using Guided Wave Technology : Case Study of Underwood Creek Force Main, Milwaukee Metropolitan Sewerage District -- Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder -- Sewer Main Condition Assessment in the Last Frontier -- LRFD Approach to CFRP Renewal of Prestressed Concrete Cylinder Pipes -- Rehabilitation of Large Diameter PCCP : Relining and Sliplining with Steel Pipe -- Miami-Dade Case Study : Managing and Minimizing Pipeline Outages through the Use of Carbon Fiber -- Field Comparison of the Axis Vacuum Microtunneling Technology vs. Open Cut Excavation in Glenview, Illinois
  • Technology How Far Can We Go? -- Southeast Collector Trunk Sewer Route Selection : The Regional Municipalities of York and Durham, Ontario, Canada -- Consideration of Embodied Energy in Sustainability Evaluation of Pipeline Projects -- Chemical Amendment of Excavated Trench Material for Sustainable Reuse -- Condition Assessments Using Pipe Penetrating Radar : The Metro Wastewater Reclamation District, Denver, CO Harvard Gulch Interceptor Case Study -- Route Selection for a $2.2 Billion Pipeline -- Replacement of a Critical Water Supply Pipeline in a Dense Urban Landscape -- M-DWASD Design-Build Procurement for Government Cut Pipeline Replacement Project -- Stockton Delta Water Project Construction Challenges -- A New Generation of FRP Laminates for Repair of Pipelines in the Gas Industry -- Design and Construction Challenges for a 36 Inch Diameter 18 Mile Reclaimed Water Pipeline -- Two Successful Installations of Large Diameter Rigid-Design Concrete Pressure Pipelines in Very Soft Soils -- Augmenting Owner's Staff with As-Needed Contracts for Large Diameter Pipeline Construction Management -- Pipeline Infrastructure Renewal at Miami-Dade Water and Sewer Department -- Delivering a Critical Raw Water Transmission Line Using Design-Build : The Perspective from Gilbert, AZ -- From Tiny Hole to Huge Problem Overnight Emergency Culvert Pipe Repair -- Lessons Learned from the Commissioning of a 21,000 HP Pump Station in San Diego -- Hiding a 96 Inch Pipeline in Your Neighbor's Backyard -- Pipe Collapse in an Amusement Park Now What Do You Do? -- San Francisco Public Utilities Commission's Water System Improvement Program : Bay Division Pipeline 5 East Bay Reaches Construction Contract Challenges in a Difficult Economy -- 60" Demonstration Installation of PressureCast Steel Pipe for the Tarrant Regional Water District -- Replacing Live Pipelines Planning for Construction Issues and Sequencing Can Keep Your System Up and Running -- Recycled Water for the Thirsty High Desert -- Longest Polyurethane Lined and Coated Steel Pipeline in North America : The Provo Reservoir Canal Enclosure Project -- Experimental Examination of Selected Limit States of Structural Liners at Locations of Ring Fracture -- Reconstruction in an Urban Environment: Kimberley Lane 8" Water Line HDD and 54" Sanitary Sewer CIPP Rehabilitation -- Basis of Design for Proposed 42 Inch Reclaimed Water Main -- Repair of a Punctured 48 in. Diameter Prestressed Concrete Cylinder Pipe on a Sixty Degree Slope -- Getting Ready for a Larger Panama Canal Assessing a Critical Large Diameter Force Main -- Buried Flexible Pipes : Deflections and Stresses Caused by an Increase in Soil Cover Highway Crossing -- Proactive Upgrade of Steel Pipelines during Scheduled Plant Outages -- Case Study of Productivity Analysis for Horizontal Directional Drilling -- The Effects of Pipe Stiffness on HDD Pull Loads -- Sustainable Flowable Fill -- How to Accelerate Design and Construction for Large Water Supply Projects -- Collaborative Bidding Approach for the Tollgate Creek Interceptor -- Three Heads are Better Than One : Efficient Solutions to Achieve the Best Value for a 6 Mile Water Main in an Urban Setting -- Planning and Modeling Solutions for a Complex Collection System : The Baton Rouge SSO Control and Wastewater Facilities Program -- Pipe Materials and Joint Selection for Trenchless Construction -- Classification and Specification of Bedding and Backfill for Buried Pipelines -- Tangent Outlet Design for Welded Steel Pipe -- Molecular Design of High Density Polyethylene for Pipes -- Reinforced Concrete Pipe Design under Extreme Loading Conditions Using ASCE Standard 15-98 and Beyond -- Untangling the Mysteries of Air Valves -- Hydraulic Modeling for Emergency Water Supply and Disaster Planning -- Finite Element Analysis of Combined-Load Performance of PressureCast Steel Pipe -- Dynamic Behavior of Buried Flexible Pipes of Varying Thickness Using the Shaking Table Test -- Designing a Critical Interceptor in an Earthquake Prone Floodplain with Limited Access : The Santa Ana River Interceptor Relocation Project -- Selecting Water Main Materials for the Los Angeles Department of Water and Power
  • Common and Challenging Questions in Water System Infrastructure Management -- Emergency Relocation of 20 Inch Sewer Force Main (HDD) -- Introducing a New Honeycomb-FRP Pipe -- Structural Design of Buried Pipes -- Surge in a Bi-Directional 48" Steel, Potable Water Pipeline -- Design to Prevent Long Running Cracks in Plastic Pipe for Water Applications -- Scoring and Selecting Rehabilitation Methodologies : How to Pick the Winning Number? -- Proven Pipeline Rehabilitation System Using Steel Liners for the San Diego County Water Authority -- Pipe Performance and Experiences during Seismic Events in New Zealand over the Last 25 Years -- Steel Cylinder Reinforcement (SCR) for Pipeline Repair or Upgrades -- Determining the Effectiveness of Chlorine-Based Biofilm Control in Large Diameter Pipelines -- Large Steel Penstock Relining : The Blue Ridge Dam Rehabilitation -- Cathodic Protection of Ductile Iron and Steel Water Pipelines -- The Design and Construction Considerations for PCCP Rehabilitation Using FRP Composites -- The Development of a Novel Steel Reinforced Composite (SRC) Liner for the Rehabilitation of Deteriorated PCCP -- Can It Handle the Pressure? Condition Assessment, Structural Evaluation, and Repair of an Existing 72 Inch PCCP Pipeline -- Beyond the Wires : A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management -- Redeveloping Phoenix's PCCP Assessment Progra : A Pragmatic Approach -- Interaction of Water Transport Pipelines with Their Surroundings and Third Party Activities -- Innovative Condition Assessment of Strategic Aqueducts -- Study on the Applicability of Currently Used Soil-Pipe Interaction Equations for Segmented Buried Pipelines Subjected to Fault Movement -- Answering 5 Basic Asset Management Questions for Pre-Stressed Concrete Water Transport Mains -- Refurbishment of the Vyrnwy Large Diameter Trunk Main -- Synthesis-Analysis of Water and Wastewater Pipeline Condition Assessment and Renewal Engineering Technologies -- Effect of Wire Breaks on Prestressed Concrete Cylinder Pipe (PCCP) Reinforced with Steel Liners A Case Study -- Lessons Learned from the Multi-Year Assessment of the Homestake Transmission Pipeline -- Locating Water Main Leaks in Texas to Conserve Resources during Times of Drought -- Estimating Residual Strength of Deteriorated 96" Interceptor and Strength Enhancement Provided by Lining Methods Using Computer Modeling and Forensic Investigation Tools -- A New Generation of Back-Reamers for HDD Installations in Cohesive and Fine to Medium Coarse Soils -- Physical Evaluation of the Dissipation of a Concentrated Load When Applied to Reinforced Concrete Pipe -- CFRP Repair and Strengthening of PCCP for Thrust Restraint -- Mapping Utility Infrastructure via Underground GPS Positioning with Autonomous Telerobotics -- WSSC's Systematic Approach to the CFRP Liner Installation Process -- Santa Fe Irrigation District (SFID) : Group 1 PRS and Valve Replacement Project J921 -- Metropolitan Utilities District of Omaha PCCP Asset Management Advancements -- Combining CFRP Lining Systems with Other Pipeline Rehabilitation Technologies -- Upper Feeder and San Gabriel Canyon Valve Structure : Hydraulic Transient Analysis -- Progress toward a Unified Thrust Restraint Design An Update -- Design-Build of Wastewater Force-Main in North Bay Village : Lessons Learned from the Design-Build Team's Perspective -- Two-Step Subsurface Characterization Process for Pipeline Project in Texas -- Condition Assessment of LWC's B.E. Payne 60" PCCP Pipeline -- Minden Uses Competitive Bidding with Alternate Pipe Materials on Large Diameter Regional Water System Work -- HDD Matches Installation Method to Long and Difficult Pipe Crossing in Macon, GA -- Comparison of Jacking Load Models for Trenchless Pipe Jacking -- Assessing Sustainability of Pipeline Projects Using Envision Rating System
Control code
891395931
Dimensions
unknown
Extent
1 online resource (1552 pages)
Form of item
online
Isbn
9780784477168
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
illustrations (chiefly color)
Specific material designation
remote
System control number
(OCoLC)891395931
Label
Pipelines 2012 : innovations in design, construction, operations, and maintenance - doing more with less : proceedings of the Pipelines 2012 Conference, August 19-22, 2012, Miami Beach, Florida, sponsored by the Pipeline Division of the American Society of Civil Engineers ; edited by Robert J. Card, P.E., Michael K. Kenny, P.E
Publication
Copyright
Bibliography note
Includes bibliographical references
Carrier category
online resource
Carrier category code
  • cr
Carrier MARC source
rdacarrier
Color
multicolored
Content category
text
Content type code
  • txt
Content type MARC source
rdacontent
Contents
  • Performance Testing of Underground Storage Tank against Buckling -- Organizing and Managing the Implementation of Large Diameter Tapping and Plugging Technology for a Major Sanitary Improvement Project in Ho Chi Minh City, Vietnam -- Ductile Iron Corrosion Theories and Science -- Design and Development of a Web-Based National Database for Water and Wastewater Pipeline Infrastructure Systems -- Fatigue of Plastic Water Pipe : A Technical Review with Recommendations for PE4710 Pipe Design Fatigue -- Novel Resilience Assessment Methodology for Water Distribution Systems -- Contingency and Emergency : Prior Planning, "Real Live" Execution, and Post Mortem of the Results -- Water Transmission Main Condition Assessment in the Last Frontier : A Magnanimous Endeavor for the Anchorage Water and Wastewater Utility -- Protection of Petroleum and Natural Gas Pipelines Crossing Debris Flow Watersheds A Case Study in the Qinling Mountains, Western China -- Meeting the Challenge of Pipeline Emergency Repair -- PressureCast Steel Pipe Combined Load Test Set-Up and Execution -- Unidirectional Flushing (UDF) : It's Not Just about Cleaning the System Anymore Benefits and Advantages that West Springfield, Massachusetts Achieved with Their Program -- Transmission Main and Plastic Pipe Leak Detection Using Advanced Correlation Technology : Case Studies -- Installation of a 42 Inch HDPE Pipeline at Seminole County's Regional Water Treatment Facility at Yankee Lake -- Risk Management in Real Time Transient Control Testing on a Large Conveyance System -- Integration of HDPE 4710 Materials for Potable Water Distribution Systems -- Five Years and Counting : The Evolution of WSSC's PCCP Management Program -- City of Westminster's Sewer Collection System Assessment Program : A Case Study -- GIS : A Decision Making Tool for Pipeline Asset Management in Atlanta -- Intake Screen Alternatives for the IPL Project Planning for Mussels and Variable Intake Depths -- Variability of Pipe Coating Pull-Off Adhesion Measurements on Cylindrical Steel Pipelines -- Evaluation of Statically-Loaded Large Diameter Steel Pipe Embedded with Lime Stabilized Native Clay Soils -- Seismic Fragility Evaluation of Water Pipelines : Part 1 Current Practice -- Galveston's Life Line Considerations When Designing an Aerial Crossing -- Who Says You Need Multiple Wire Breaks for a PCCP Pipe to Fail? -- Condition Evaluation of Asbestos Cement Water Mains -- Numbers Don't Lie : PCCP Performance and Deterioration Based on a Statistical Review of a Decade of Condition Assessment Data -- From Pilot to Permanent : Evolution of LWC's PCCP Condition Assessment Program -- A Methodology for Condition Assessment of Pressure Water Mains -- Implementation of Sustainability Initiatives and the Envision Rating System on the Omaha CSO Program -- PCCP Condition Assessment Methodology : What Is Right for You? -- Enhancing Asset Management Priority Ranking A Case Study -- Condition Assessment of 23 Lift Stations -- Integrated Monitoring Strategy for Large Diameter Pre-Stressed Concrete Pipelines A Case Study at Waternet, the Netherlands -- Protecting the Magic City -- Pilot Large Diameter Pipeline Seismic Fragility Assessment -- Restoring Water Network Reliability and Control in the City of Baltimore -- New Approaches to Inspect Water Pipelines Running under Rivers, Lakes, Levies, and Critical Transport Infrastructure -- Reducing the Cost of Failure : Time is the Unforgiving Enemy during Pipeline Ruptures -- The Problem of Leakage Detection on Large Diameter Mains -- Condition Assessment of a Ductile Iron Force Main Using Guided Wave Technology : Case Study of Underwood Creek Force Main, Milwaukee Metropolitan Sewerage District -- Failure Risk of Bar-Wrapped Pipe with Broken Bars and Corroded Cylinder -- Sewer Main Condition Assessment in the Last Frontier -- LRFD Approach to CFRP Renewal of Prestressed Concrete Cylinder Pipes -- Rehabilitation of Large Diameter PCCP : Relining and Sliplining with Steel Pipe -- Miami-Dade Case Study : Managing and Minimizing Pipeline Outages through the Use of Carbon Fiber -- Field Comparison of the Axis Vacuum Microtunneling Technology vs. Open Cut Excavation in Glenview, Illinois
  • Technology How Far Can We Go? -- Southeast Collector Trunk Sewer Route Selection : The Regional Municipalities of York and Durham, Ontario, Canada -- Consideration of Embodied Energy in Sustainability Evaluation of Pipeline Projects -- Chemical Amendment of Excavated Trench Material for Sustainable Reuse -- Condition Assessments Using Pipe Penetrating Radar : The Metro Wastewater Reclamation District, Denver, CO Harvard Gulch Interceptor Case Study -- Route Selection for a $2.2 Billion Pipeline -- Replacement of a Critical Water Supply Pipeline in a Dense Urban Landscape -- M-DWASD Design-Build Procurement for Government Cut Pipeline Replacement Project -- Stockton Delta Water Project Construction Challenges -- A New Generation of FRP Laminates for Repair of Pipelines in the Gas Industry -- Design and Construction Challenges for a 36 Inch Diameter 18 Mile Reclaimed Water Pipeline -- Two Successful Installations of Large Diameter Rigid-Design Concrete Pressure Pipelines in Very Soft Soils -- Augmenting Owner's Staff with As-Needed Contracts for Large Diameter Pipeline Construction Management -- Pipeline Infrastructure Renewal at Miami-Dade Water and Sewer Department -- Delivering a Critical Raw Water Transmission Line Using Design-Build : The Perspective from Gilbert, AZ -- From Tiny Hole to Huge Problem Overnight Emergency Culvert Pipe Repair -- Lessons Learned from the Commissioning of a 21,000 HP Pump Station in San Diego -- Hiding a 96 Inch Pipeline in Your Neighbor's Backyard -- Pipe Collapse in an Amusement Park Now What Do You Do? -- San Francisco Public Utilities Commission's Water System Improvement Program : Bay Division Pipeline 5 East Bay Reaches Construction Contract Challenges in a Difficult Economy -- 60" Demonstration Installation of PressureCast Steel Pipe for the Tarrant Regional Water District -- Replacing Live Pipelines Planning for Construction Issues and Sequencing Can Keep Your System Up and Running -- Recycled Water for the Thirsty High Desert -- Longest Polyurethane Lined and Coated Steel Pipeline in North America : The Provo Reservoir Canal Enclosure Project -- Experimental Examination of Selected Limit States of Structural Liners at Locations of Ring Fracture -- Reconstruction in an Urban Environment: Kimberley Lane 8" Water Line HDD and 54" Sanitary Sewer CIPP Rehabilitation -- Basis of Design for Proposed 42 Inch Reclaimed Water Main -- Repair of a Punctured 48 in. Diameter Prestressed Concrete Cylinder Pipe on a Sixty Degree Slope -- Getting Ready for a Larger Panama Canal Assessing a Critical Large Diameter Force Main -- Buried Flexible Pipes : Deflections and Stresses Caused by an Increase in Soil Cover Highway Crossing -- Proactive Upgrade of Steel Pipelines during Scheduled Plant Outages -- Case Study of Productivity Analysis for Horizontal Directional Drilling -- The Effects of Pipe Stiffness on HDD Pull Loads -- Sustainable Flowable Fill -- How to Accelerate Design and Construction for Large Water Supply Projects -- Collaborative Bidding Approach for the Tollgate Creek Interceptor -- Three Heads are Better Than One : Efficient Solutions to Achieve the Best Value for a 6 Mile Water Main in an Urban Setting -- Planning and Modeling Solutions for a Complex Collection System : The Baton Rouge SSO Control and Wastewater Facilities Program -- Pipe Materials and Joint Selection for Trenchless Construction -- Classification and Specification of Bedding and Backfill for Buried Pipelines -- Tangent Outlet Design for Welded Steel Pipe -- Molecular Design of High Density Polyethylene for Pipes -- Reinforced Concrete Pipe Design under Extreme Loading Conditions Using ASCE Standard 15-98 and Beyond -- Untangling the Mysteries of Air Valves -- Hydraulic Modeling for Emergency Water Supply and Disaster Planning -- Finite Element Analysis of Combined-Load Performance of PressureCast Steel Pipe -- Dynamic Behavior of Buried Flexible Pipes of Varying Thickness Using the Shaking Table Test -- Designing a Critical Interceptor in an Earthquake Prone Floodplain with Limited Access : The Santa Ana River Interceptor Relocation Project -- Selecting Water Main Materials for the Los Angeles Department of Water and Power
  • Common and Challenging Questions in Water System Infrastructure Management -- Emergency Relocation of 20 Inch Sewer Force Main (HDD) -- Introducing a New Honeycomb-FRP Pipe -- Structural Design of Buried Pipes -- Surge in a Bi-Directional 48" Steel, Potable Water Pipeline -- Design to Prevent Long Running Cracks in Plastic Pipe for Water Applications -- Scoring and Selecting Rehabilitation Methodologies : How to Pick the Winning Number? -- Proven Pipeline Rehabilitation System Using Steel Liners for the San Diego County Water Authority -- Pipe Performance and Experiences during Seismic Events in New Zealand over the Last 25 Years -- Steel Cylinder Reinforcement (SCR) for Pipeline Repair or Upgrades -- Determining the Effectiveness of Chlorine-Based Biofilm Control in Large Diameter Pipelines -- Large Steel Penstock Relining : The Blue Ridge Dam Rehabilitation -- Cathodic Protection of Ductile Iron and Steel Water Pipelines -- The Design and Construction Considerations for PCCP Rehabilitation Using FRP Composites -- The Development of a Novel Steel Reinforced Composite (SRC) Liner for the Rehabilitation of Deteriorated PCCP -- Can It Handle the Pressure? Condition Assessment, Structural Evaluation, and Repair of an Existing 72 Inch PCCP Pipeline -- Beyond the Wires : A Sustainable Approach to Prestressed Concrete Cylinder Pipe Management -- Redeveloping Phoenix's PCCP Assessment Progra : A Pragmatic Approach -- Interaction of Water Transport Pipelines with Their Surroundings and Third Party Activities -- Innovative Condition Assessment of Strategic Aqueducts -- Study on the Applicability of Currently Used Soil-Pipe Interaction Equations for Segmented Buried Pipelines Subjected to Fault Movement -- Answering 5 Basic Asset Management Questions for Pre-Stressed Concrete Water Transport Mains -- Refurbishment of the Vyrnwy Large Diameter Trunk Main -- Synthesis-Analysis of Water and Wastewater Pipeline Condition Assessment and Renewal Engineering Technologies -- Effect of Wire Breaks on Prestressed Concrete Cylinder Pipe (PCCP) Reinforced with Steel Liners A Case Study -- Lessons Learned from the Multi-Year Assessment of the Homestake Transmission Pipeline -- Locating Water Main Leaks in Texas to Conserve Resources during Times of Drought -- Estimating Residual Strength of Deteriorated 96" Interceptor and Strength Enhancement Provided by Lining Methods Using Computer Modeling and Forensic Investigation Tools -- A New Generation of Back-Reamers for HDD Installations in Cohesive and Fine to Medium Coarse Soils -- Physical Evaluation of the Dissipation of a Concentrated Load When Applied to Reinforced Concrete Pipe -- CFRP Repair and Strengthening of PCCP for Thrust Restraint -- Mapping Utility Infrastructure via Underground GPS Positioning with Autonomous Telerobotics -- WSSC's Systematic Approach to the CFRP Liner Installation Process -- Santa Fe Irrigation District (SFID) : Group 1 PRS and Valve Replacement Project J921 -- Metropolitan Utilities District of Omaha PCCP Asset Management Advancements -- Combining CFRP Lining Systems with Other Pipeline Rehabilitation Technologies -- Upper Feeder and San Gabriel Canyon Valve Structure : Hydraulic Transient Analysis -- Progress toward a Unified Thrust Restraint Design An Update -- Design-Build of Wastewater Force-Main in North Bay Village : Lessons Learned from the Design-Build Team's Perspective -- Two-Step Subsurface Characterization Process for Pipeline Project in Texas -- Condition Assessment of LWC's B.E. Payne 60" PCCP Pipeline -- Minden Uses Competitive Bidding with Alternate Pipe Materials on Large Diameter Regional Water System Work -- HDD Matches Installation Method to Long and Difficult Pipe Crossing in Macon, GA -- Comparison of Jacking Load Models for Trenchless Pipe Jacking -- Assessing Sustainability of Pipeline Projects Using Envision Rating System
Control code
891395931
Dimensions
unknown
Extent
1 online resource (1552 pages)
Form of item
online
Isbn
9780784477168
Media category
computer
Media MARC source
rdamedia
Media type code
  • c
Other physical details
illustrations (chiefly color)
Specific material designation
remote
System control number
(OCoLC)891395931

Library Locations

    • Ellis LibraryBorrow it
      1020 Lowry Street, Columbia, MO, 65201, US
      38.944491 -92.326012
    • Engineering Library & Technology CommonsBorrow it
      W2001 Lafferre Hall, Columbia, MO, 65211, US
      38.946102 -92.330125
Processing Feedback ...